01High-density GPU clusters
AIDC & AI Factories
- 10MW centralized AIDC
- 1MW liquid-cooled pod
- SST-fed 800VDC
- Power-compute-cooling optimization
- Multi-campus scheduling
- Green compute operations

INTEGRATED SOLUTIONS
Equipment configuration, system architecture and work scope are based on capacity, voltage, supply reliability, load profile and operating requirements.




DELIVERY MODEL
Confirm load, connection, operating mode and project objectives
Complete equipment selection, single-line design, interfaces and economics
Run prototype checks, FAT/SAT, system commissioning and protection tests
Provide remote service, policy tuning and market-operation support
START A CONVERSATION
Provide the application, capacity, grid connection, load profile and project objectives. We will use them to define equipment, system interfaces and the scope of delivery.